An EOQ Model Under the Condition of Permissible Delay in Payments with Allowed Stock-Out Cost and Lead Time
DOI:
https://doi.org/10.37256/cm.5120242462Keywords:
carrying cost, economic order quantity, interest payable, interest earned, lead time, planning horizon, replenishment rate, stock-out costAbstract
From this present study, derive the two consecutive demands between the time intervals: economic order quantity and total annual variable cost. The solution for this inventory model is optimizing the total annual variable cost. Here, given an arithmetical example and sensitivity analysis for the provision of the inventory model, assume the planning horizon and replenishment rate are infinite. To the best of our knowledge, this is the first study to find out the total annual variable cost using various costs under the condition of a permissible delay in payments with an allowed stock-out cost and lead time.
Downloads
Published
How to Cite
Issue
Section
Categories
License
Copyright (c) 2024 Jayanthi J
This work is licensed under a Creative Commons Attribution 4.0 International License.