[1]
J, J. 2024. An EOQ Model Under the Condition of Permissible Delay in Payments with Allowed Stock-Out Cost and Lead Time. Contemporary Mathematics. 5, 1 (Feb. 2024), 628–644. DOI:https://doi.org/10.37256/cm.5120242462.