[1]
R, R. and K, I. 2024. Metaheuristic Cost Optimization of <i>M<sup>X</sup>/G<sub>1</sub>,G<sub>2</sub>/</i> 1 Queue with Service disruption, Working breakdown, Balking, Catastrophe and Extended Server Vacation with Bernoulli Schedule. Contemporary Mathematics. 5, 2 (May 2024), 1397–1425. DOI:https://doi.org/10.37256/cm.5220244022.