M, P., & M, V. (2024). Impact of Inspection Error of an Economic Production Quantity Model with Acceptance Sampling, Defective Items, and Rework.
Contemporary Mathematics
,
5
(1), 665–684. https://doi.org/10.37256/cm.5120242426