M, Palanivel, and Venkadesh M. 2024. “Impact of Inspection Error of an Economic Production Quantity Model With Acceptance Sampling, Defective Items, and Rework”. Contemporary Mathematics 5 (1):665-84. https://doi.org/10.37256/cm.5120242426.