EL-Sherbeny , Mohamed S. 2026. “Probabilistic Evaluation of Industrial Systems Under Daily Operational Cycles With Constraints on Maximum Repair Time”. Contemporary Mathematics 7 (1):1129-53. https://doi.org/10.37256/cm.7120268121.