EL-Sherbeny , M. S. (2026) “Probabilistic Evaluation of Industrial Systems Under Daily Operational Cycles with Constraints on Maximum Repair Time”, Contemporary Mathematics , 7(1), pp. 1129–1153. doi: 10.37256/cm.7120268121.