[1]
M. S. EL-Sherbeny, “Probabilistic Evaluation of Industrial Systems Under Daily Operational Cycles with Constraints on Maximum Repair Time”, Contemp. Math., vol. 7, no. 1, pp. 1129–1153, Jan. 2026.